Custom engineered mesh

PROJECT:

Accommodation units

DESCRIPTION:

The original details called for standard fabric, which would have required a great deal of on-site cutting resulting in significant labour costs and delays to the site programme. The contractor asked BRC to re-engineer the steel reinforcement to establish whether there was a faster, more efficient solution.

SOLUTION:

Our proposal involved re-detailing the floor area reinforcement making use of custom engineered mesh in sheet sizes to suit the specific bay sizes of the project, and including bar requirements within the mesh.

BENEFITS:

Two day time saving against the original three day estimate to cut and position standard fabric!